Blower unit for WWTP Daleszyce (PL)

Water management

Blower unit for WWTP Daleszyce (PL)

For the Daleszyce WWTP, we delivered a total of 5 pieces of identical 3D38B-100E (15 kW) blower units in a version with external stainless steel acoustic covers....

Fishery Nové Hrady – Fish farm Štiptoň (CZ)

Agriculture

Fishery Nové Hrady – Fish farm Štiptoň (CZ)

In September 2020, we delivered an aeration system and 2 KUBÍČEK blower units type 3D38B-100E, for fish farm Štiptoň near Nové Hrady. The supply of air to the individual...

Blower unit for WWTP Havlíčkův Brod (CZ)

Water management

Blower unit for WWTP Havlíčkův Brod (CZ)

In July 2020, we put into operation a new large blower unit 3D90B-300K (132 kW) at the Havlíčkův Brod WWTP. The unit supplies air to the fine-bubble aeration system...

Blower units for WWTP in Toluca (Mex)

Water management

Blower units for WWTP in Toluca (Mex)

Delivery of 4 units with stainless steel covers, for a WWTP located in a luxury sports center in Toluca, Mexico. The treatment plant is dimensioned as a double...

Road repair trucks KOBIT – TURBO (CZ)

Industry

Road repair trucks KOBIT – TURBO (CZ)

For more than 10 years, we have been supplying KOBIT with units tailored to their requirements, designed for TURBO road repair trucks.The company KOBIT deals...

Blower unit for WWTP Zábřeh na Moravě (CZ)

Water management

Blower unit for WWTP Zábřeh na Moravě (CZ)

In June 2020, we put into operation a new 3D55C-200K (75 kW) blower unit at the WWTP Zábřeh na Moravě. The unit serves as a replacement for obsolete blowers from...

Blower sets for WWTP in Tulum (Mex)

Water management

Blower sets for WWTP in Tulum (Mex)

Delivery of 4 units with stainless steel covers, for a WWTP belonging to a residential building in a very interesting tourist locality of Tulum in Mexico. The treatment...

Blower units for the Zhezkazghan copper ore processing plant (KZ)

Industry

Blower units for the Zhezkazghan copper ore processing plant (KZ)

Annual evaluation of the operation of 2 units of 3D100C-500K (500 kW) and heat exchangers AWI 300/1490 in difficult conditions of the copper ore processing plant...